Cable-stayed bridge at dusk over Florida coastal fog
Compliance · Coordination · Governance

Coordinate urban
infrastructure end to end.

Compliance audit, land regularization, telecom-IoT, and multidisciplinary program control — under one method, for Florida Central operators and builders.

Built on Luciane Tenório's proprietary methodology, the platform turns audits, telemetry, land records, and program data into a single decision layer for infrastructure delivery.

Multi-asset portfolio visibility Risk-informed intervention Methodology-calibrated scoring Digital context for decisions Executive portfolio intelligence
The Challenge

Fragmented data.
Delayed decisions.
Invisible risk.

Programs responsible for aging or high-growth infrastructure routinely operate with disconnected audits, inconsistent risk scoring, fragmented parcel records, and weak portfolio-level visibility.

The consequence is compounding — delayed corrective actions, misallocated engineering hours, untracked deterioration, and structural risks that surface only when they can no longer be scheduled.

Advance Urban Integration closes that gap. Scattered civil, telecom, and land data become a coherent decision layer for owners, operators, and program leadership across the Polk–Tampa–Space Coast axis.

78%
firms with delayed projects
874k
Polk County population 2025
8,236
Polk residential permits
Civil engineer with tablet inspecting drainage site at golden hour
Field Truth

“The audit-to-corrective loop finally closes on the same platform our field teams already use.”

COO · Lakeland Multifamily Developer
Platform

Six integrated modules.
One method owner.

From compliance audit to executive review — a complete decision layer for integrated urban infrastructure. Coordinates delivery; does not replace licensed engineering seals under Florida practice rules.

01

Compliance Audit

BIM-supported NCR tracking, corrective plans, and outcome ledgers governed under founder methodology.

Enter module
02

Telecom & IoT

Field-node registry, live telemetry, and corridor uptime across physical assets on the I-4 axis.

Enter module
03

Tech-Economic Analysis

Scenario models tied to project control, risk index, and multi-asset portfolio decisions.

Enter module
04

Land Regularization

GIS-aware regularization tracks, parcel governance, and 90-day methodology checklists.

Enter module
05

Project Control

Multidisciplinary PM across civil, telecom, land, and compliance interfaces — one board.

Enter module
06

Supervised Training

Cohort tracks under founder-directed methodology — regulatory, monitoring, PM, sustainability.

Enter module
Live decision layer

A single view of every
engagement.

Compliance closure, telecom uptime, and regularization milestones on one timeline — with a risk index calibrated to methodology and a queue of critical assets to look at first.

47
Open NCRs
↓ 11.2% MoM
18
Active engagements
↑ 8.4%
12
Regularization tracks
↑ 2 new
132
Assets online
↑ stable
Coordination throughput
Last 12 months · FL Central portfolio
Live
Risk index
72
Portfolio
Critical asset
NCR-PK-014
Highland Ridge · 14d open
Next review
2026-08-03
Founder · Luciane Tenório
Inside the platform

Every audit, node and parcel — measured.

A live cross-section of what operators see once engaged: risk pies, module maturity, funnel throughput, geographic footprint, and the ledger of critical assets, audits, IoT nodes and regularization tracks currently under coordination.

NCR by severity
Last 90 days · portfolio
Critical · 9 Major · 18 Minor · 20
Module maturity
Methodology adherence score
Intake → Review funnel
Active engagements this quarter
Intake84
Risk Class62
Corrective Plan41
Supervised Exec28
Methodology Review19
FL Central footprint
Hub: Lakeland–Winter Haven
Lakeland (Hub)
Polk · 6 engagements
Winter Haven
Polk · 3 engagements
Bartow
Polk · 2 engagements
Tampa
Hillsborough · 3
Clearwater
Pinellas · 1
Melbourne
Brevard · 2
Cocoa
Brevard · IOT-BR-044 offline
Gainesville
Alachua · 2
Daytona Beach
Volusia · 1
Active Onboarding Critical
Where to look first
Top 5 critical assets
NCR-PK-014
Highland Ridge Phase 2 · Drainage
91
IOT-BR-044
Cocoa Handhole H-09 · Fiber
88
REG-PK-08
Cedar Grove Tract · Stage 3
74
AUD-2026-0129
Space Coast Fiber Ring · Telecom
68
PRJ-FL-2210
I-4 Corridor Constructors · Civil-Telecom
61
Activity feed
Last 24 hours
NCR-PK-014 closed on Highland Ridge Phase 2
12m ago
Sensor node IOT-TB-221 online — Winter Haven lift station
38m ago
Regularization track REG-PK-08 advanced to Stage 3
1h ago
Audit package AUD-2026-0142 opened — drainage package
2h ago
Cohort FL-0626 readiness average crossed 80
3h ago
Methodology review scheduled with founder — PRJ-FL-2210
5h ago
NCR-BR-021 escalated to Critical — Cocoa H-09
6h ago
IOT-PK-087 degraded on Lakeland Corridor C-12
7h ago
REG-AL-03 documents uploaded — Gainesville Infill
9h ago
AUD-2026-0138 corrective plan submitted — Cedar Grove
1d ago
Developers
6
Utilities
4
Contractors
5
Integrators
3
Compliance audits
Open, corrective and recently closed
AuditProjectCountyDisciplineRiskBIMStatusLast update
AUD-2026-0142Highland Ridge MFPolkDrainage78RVT-HR-02Open2026-07-12
AUD-2026-0138Cedar Grove TractPolkSanitation64RVT-CG-01Corrective2026-07-08
AUD-2026-0129Space Coast Fiber RingBrevardTelecom51RVT-SC-07Closed2026-06-28
AUD-2026-0125Winter Haven LS-04PolkSanitation44RVT-WH-03Closed2026-06-21
AUD-2026-0121Gainesville Infill Lot 14AlachuaCivil59RVT-GA-04Open2026-06-15
AUD-2026-0118Daytona Corridor D-02VolusiaDrainage72RVT-DY-01Corrective2026-06-10
AUD-2026-0114Tampa East SubstationHillsboroughCivil38RVT-TE-06Closed2026-06-01
AUD-2026-0109Melbourne Reuse LineBrevardSanitation67RVT-MB-02Open2026-05-24
Telecom / IoT nodes
Live telemetry snapshot
NodeSiteStatusUptime
IOT-TB-221Winter Haven LS-04
Lift station
Online
98%
IOT-PK-087Lakeland Corridor C-12
Corridor
Degraded
91%
IOT-BR-044Cocoa Handhole H-09
Fiber handhole
Offline
0%
IOT-TB-198Tampa East Substation
Substation
Online
99%
IOT-BR-052Melbourne LS-02
Lift station
Online
97%
IOT-PK-091Bartow Corridor B-04
Corridor
Online
96%
IOT-VL-018Daytona Handhole H-03
Fiber handhole
Degraded
89%
IOT-AL-011Gainesville LS-01
Lift station
Online
95%
Land regularization tracks
Stage 1–5 · 90-day methodology
TrackParcelStageDue
REG-PK-08Cedar Grove Tract
Polk · R-2
2026-09-30
REG-PK-11Highland Ridge Phase 2
Polk · PUD
2026-10-15
REG-AL-03Gainesville Infill Lot 14
Alachua · MU-1
2026-08-22
REG-BR-06Cocoa Waterfront Parcel
Brevard · C-2
2026-11-05
REG-VL-02Daytona South Assembly
Volusia · R-3
2026-08-08
REG-PK-14Bartow North Lot
Polk · R-1
2026-12-01
Jurisdiction × discipline risk heatmap
Composite index · 0–100
CountyDrainageSanitationTelecomCivilLand Use
Polk
78
64
42
55
71
Hillsborough
48
39
61
33
44
Brevard
52
47
68
41
58
Alachua
44
51
36
59
62
Volusia
66
43
55
47
51
$772,080
Y1 gross revenue target
$10.1M
5-year pipeline
874,790
Polk pop. (+20.7% since 2020)
8,236
Polk residential permits · 2025
Aerial telecom corridor at twilight cutting through Florida suburban development
I-4 Corridor
Polk · Tampa · Space Coast
Who we serve

Institutional buyers along the
Florida Central axis.

Developers
Site-to-closeout coordination for multifamily and mixed-use programs.
Utility Operators
Water, sewer, energy, and telecom asset governance.
Licensed Contractors
PM interfaces without displacing sealed engineering scope.
Telecom Integrators
Corridor and IoT programs across the I-4 axis.
Expansion to Texas and California from year three after Florida validation.
Commercial model

Pricing that follows
the engagement.

Quoted per engagement under the Business Plan pricing model. No subscription list price. Complexity and regulatory premiums are named up front — never surfaced late.

Essential
First coordination cycle for developers and owners.
Quoted per engagement
See details
Most Popular
Professional
Full audit, BIM/GIS, PM, and two supervised training tracks.
Quoted per engagement
See details
Enterprise
Multi-asset operators: telecom-IoT + tech-economic + advanced PM.
Quoted per engagement
See details
Technical Direction
Portfolio program with monthly methodology review by Luciane Tenório.
Quoted per engagement
See details
Voices from delivery
01
Regularization tracks and telemetry sit in one governance view — we stopped chasing spreadsheets.
Operations Director
Central FL water utility
02
Methodology review keeps our subcontractor interfaces honest without adding seal scope.
Project Director
Licensed general contractor, I-4 corridor
03
The 90-day roadmap put a real risk map in our hands two weeks after contract.
COO
Space Coast fiber integrator
Concrete water treatment plant at dusk
Begin the engagement

A ninety-day roadmap
from contract to first risk map.

Guided deployment under Luciane Tenório's methodology. Site diagnostic, module setup, integrations, cohort onboarding — and the cadence of methodology reviews that keeps a portfolio disciplined.